
The boardwalk construction and planting is underway as part of the beautification of the stormwater ponds in Stage 8 of the Longhust subdivision in Christchurch. Things are starting to take shape very nicely.


The boardwalk construction and planting is underway as part of the beautification of the stormwater ponds in Stage 8 of the Longhust subdivision in Christchurch. Things are starting to take shape very nicely.